{"id":9381,"date":"2026-10-30T14:47:01","date_gmt":"2026-10-30T13:47:01","guid":{"rendered":"https:\/\/settanta7.com\/open-day-fondo-sacca-messina\/"},"modified":"2026-11-16T14:48:51","modified_gmt":"2026-11-16T13:48:51","slug":"open-day-fondo-sacca-messina","status":"publish","type":"post","link":"https:\/\/settanta7.com\/en\/open-day-fondo-sacca-messina\/","title":{"rendered":"Open Day Fondo Sacc\u00e0, Messina"},"content":{"rendered":"<p>Fondo Sacc\u00e0 opens its doors to professionals!<\/p>\n<p>On Thursday 29 October in Messina, the Fondo Sacc\u00e0 construction site hosted a technical and training Open Day organised by the Government\u2019s Special Commissioner for the Regeneration of Messina\u2019s Shantytowns, under the patronage of the Order of Engineers of the Province of Messina and the Order of Architects, Planners, Landscape Architects and Conservators of the Province of Messina.<br \/>\nThe morning was dedicated to exploring the interplay of the various disciplines involved in the construction of a multi-storey building \u2013 a timber social housing project: from the architectural and urban planning vision to design in seismic areas, from the role of connections and ductility to computational design as a tool for integrating design, engineering and the construction process.<br \/>\nFondo Sacc\u00e0 thus serves as a concrete case study through which to explore the possibilities offered by modern timber construction technologies within an urban regeneration project, observing first-hand how design, structure and the building site can interact within an integrated process.<br \/>\nThe morning concluded with a technical visit to the building site, to see the solutions outlined during the presentations at close quarters and to exchange views with the professionals involved.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fondo Sacc\u00e0 opens its doors to professionals! On Thursday 29 October in Messina, the Fondo Sacc\u00e0 construction site hosted a technical and training Open Day organised by the Government\u2019s Special Commissioner for the Regeneration of Messina\u2019s Shantytowns, under the patronage of the Order of Engineers of the Province of Messina and the Order of Architects, [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":9382,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[133],"tags":[],"class_list":["post-9381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events"],"_links":{"self":[{"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/posts\/9381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/comments?post=9381"}],"version-history":[{"count":2,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/posts\/9381\/revisions"}],"predecessor-version":[{"id":9387,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/posts\/9381\/revisions\/9387"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/media\/9382"}],"wp:attachment":[{"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/media?parent=9381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/categories?post=9381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/settanta7.com\/en\/wp-json\/wp\/v2\/tags?post=9381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}